![]() |
|||||||||||||||
|
|
|||||||||||||||
|
|||||||||||||||
| |
|||||||||||||||
|
|
|||||||||||||||
Gravity
Feed HVLP(nozzles between 1.6-1.8 mm. are required) This gun will be suited for spraying small amounts of material, or performing touch ups. <Details> |
$475
|
Remote
Pot (production gun) This gun is more suited for production, the spray gun is easier to manipulate, and pot will hold more coating. <Details> |
$499
|
Dessicant
Dryer<Details> |
$390
|
Side
Down Draft Booth(second set of "drive through" doors) Depending on how dust free the space is where the booth is located, a drying room may or may not be needed. A drying room could be an additional booth less the fans and motors approx. $7,200 (or construct your own enclosed space). <Details> |
$9,700
|
|
|
$12,000
|
Masking
Racks (4), 1 rack in spraying, 1 rack being loaded, 1 rack drying
and 1 being unloaded.* Reduce rack count if volume doesn't require
full parallel operation. A tube loader is available. It automatically
loads the lineal (30 second cycle time) into the tube. Cost is around
$11,000 -$13,000 depending on the length of the profiles. This unit is
optional, since initially tubes could be loaded manually. An alternative
to the vertical masking rack, is to work horizontally, and to use masking
forms (or even the masking tubes, $2.20/ft. ).The throughput would be
lower since no more than 6-8 sticks could be processed at a time. * Available from AquaSurTech Oem. |
$6,160
|
|
|
$950
|
|
* Available from AquaSurTech Oem. |
$3,800
|
| 3 Tables (4X8) are required for cleaning the lineal (or
masking when necessary). 4 floor fans (2 per side of the masking rack) can be helpful in improving the drying efficiency. |
These items might already be available
in-house or can be built inexpensively. Pricing is not included here. |
| See >> Paint Room Supplies (consumables) |
$400
(estimate) |
| ESTIMATED TOTAL INVESTMENT : |
$33,000 - $53,000 US
|
Call AQUASURTECH OEM if you have any questions.
Notes:
1/ Depending on how much throughput is required, labor will need to
be scaled accordingly. In order to achieve 10,000 feet per shift, at least
three people will be required to prep the vinyl and load the tubes. One painter,
and an additional person for unloading would be required.
2/ Please select your "standard color" offering while building your paint facility. This will provide us adequate time to match colors and get approvals, or provide some coated samples .
3/ Higher volume conveyorized manual configurations can be quoted. Please consult AquaSurTech.
4/ Fully automated spraying or vacuum coating
is not suggested for a fabricator. Apart from high initial investments, these
systems tend to be maintenance intensive, and lack the flexibility to handle
many different shapes, and quick changeovers of color. AquaSurTech is continuing
to monitor the state of this technology.