Below you will find a suitable configuration for a higher volume application suited for spraying up to 10,000 lineal feet per shift.

Most items can be sourced from a single supplier : see www.TOOLSUSA.com.

Bill McCown 1-800- 451-2425 is a contact at tools USA. Alternatively any local supplier to Automotive Paint Shops should be able to supply many of the components.

Please inform AquaSurTech prior to placing an order with TOOLS USA.

Assumptions

1/ Shop air will be supplied to the paint booth . (otherwise a separate compressor needs to be added).

 

 
 

2/ A sink and counter is available near the spray booth. A storage area for paint should also be located close to the sink. No special storage is required for our non flammable water based technology.

3/ Air make up systems has not been included. Depending on how long the booth will be operating this is something that should be considered. It can add up to $10,000 to the installation. It can also be added later once the volume builds up .

4/
Installation will be performed by in-house personnel, and a certified electrician. Modifications to the building will be necessary to accept the exhaust from the booth. TOOLS USA can perform the booth installation if desired.

 

 

Copyright©All rights reserved: AquaSurTech OEM -  2148 Trans-Canada Highway, Dorval, Quebec, CANADA  H9P 2N4  - Tel.: (514) 684-2628                  
Home . Products . Process . Equipment . Services . Contact                  
 
 
List of Equipment & Supplies (High Volume)

 
Gravity Feed HVLP
(nozzles between 1.6-1.8 mm. are required)
This gun will be suited for spraying small amounts of material, or performing touch ups.
<Details>
$475
Remote Pot (production gun)
This gun is more suited for production, the spray gun is easier to manipulate, and pot will hold more coating.
<Details>
$499
Dessicant Dryer
<Details>
$390
Side Down Draft Booth
(second set of "drive through" doors)
Depending on how dust free the space is where the booth is located, a drying room may or may not be needed. A drying room could be an additional booth less the fans and motors… approx. $7,200 (or construct your own enclosed space).
                         <Details>
$9,700

Infratech Portable IR System (6 units)
Three portable units would be required to dry each side of the masking rack. A 15 minute cycle time would be adequate before unloading the tubes and put the lineal onto drying racks. If a drying room is purchased or built, Infratech has put together a package which could be integrated into it (it is more or less the same cost as above). See www.infratech-usa.com for direct link to Infratech. <Details>

$12,000
Masking Racks (4), 1 rack in spraying, 1 rack being loaded, 1 rack drying and 1 being unloaded.* Reduce rack count if volume doesn't require full parallel operation. A tube loader is available. It automatically loads the lineal (30 second cycle time) into the tube. Cost is around $11,000 -$13,000 depending on the length of the profiles. This unit is optional, since initially tubes could be loaded manually. An alternative to the vertical masking rack, is to work horizontally, and to use masking forms (or even the masking tubes, $2.20/ft. ).The throughput would be lower since no more than 6-8 sticks could be processed at a time.

* Available from AquaSurTech Oem.
$6,160

Rolling Table (1)*

* Available from AquaSurTech Oem.

$950

Drying Racks (4)*
These can be supplemented with in-house racking if needed.

* Available from AquaSurTech Oem.

$3,800
3 Tables (4X8) are required for cleaning the lineal (or masking when necessary).
4 floor fans (2 per side of the masking rack) can be helpful in improving the drying efficiency.

These items might already be available
in-house or can be built inexpensively. Pricing is not included here.
See >> Paint Room Supplies (consumables)
$400
(estimate)
ESTIMATED TOTAL INVESTMENT :
$33,000 - $53,000 US

Call AQUASURTECH OEM if you have any questions.

Notes:

1/ Depending on how much throughput is required, labor will need to be scaled accordingly. In order to achieve 10,000 feet per shift, at least three people will be required to prep the vinyl and load the tubes. One painter, and an additional person for unloading would be required.

2/ Please select your "standard color" offering while building your paint facility. This will provide us adequate time to match colors and get approvals, or provide some coated samples .

3/ Higher volume conveyorized manual configurations can be quoted. Please consult AquaSurTech.

4/ Fully automated spraying or vacuum coating is not suggested for a fabricator. Apart from high initial investments, these systems tend to be maintenance intensive, and lack the flexibility to handle many different shapes, and quick changeovers of color. AquaSurTech is continuing to monitor the state of this technology.